free roofing estimates 1. FREE ESTIMATE
Whether you call in and speak to one of our live secretaries or submit an online estimate request form, we will be able to provide you with a free estimate handled by one of our roofing professionals.
roofing contract 2. THE CONTRACT
Once a roofing professional has come out, you will receive a proposal for the work that we are able to perform. We will provide you with two copies of the contract, one for you to keep for your records and a second for you to sign and return to US. Once we have received the signed contract your job goes directly into the scheduling department to be setup for completion.
job scheduling 3. SCHEDLUING YOUR JOB
After the contract has been received, we will schedule your job. We will select the best crew for your project, and a time for the work to begin (weather permitting). Once we are ready to begin the job we will order any material that is needed, and have it delivered, or brought to the job site by the roofers themselves.
roof work preparation 4. PREPARING THE JOB SITE
When the crew arrives, they will begin setting up everything needed to complete your job. This may include tarps, ladders, plywood, extension cords, etc. If there are any questions that you would like to ask during any part of this process, please give us a call. It is always best to inform us of any concerns as soon as possible so we can address them.
tearing off an old roof 5. TEARING OFF YOUR OLD ROOF
Tearing off an existing roof can be a loud and dangerous process. There is a lot of weight coming off of your home, about 10,000 lbs on average. All of this material has to come off and is placed either directly into a dumpster or on the ground and removed by hand. It is important to understand that we do this everyday, and that many homeowners only have a roof done once or twice in their lives. So again, if there are any questions or concerns please give us a call and we will be able to answer any questions you may have.
Following the tear off process we can inspect the original roof deck. This is the time to assess the amount of wood that should be replaced. Many home require little to no new wood, while others could need sections replaced, as it is about 20% of our customers need no new wood at all, 2% need alot (over 400 feet), but the average funs 10 - 20 sq. ft.
6. INSTALLING YOUR NEW ROOF
With a solid deck to work with, we are ready to begin installing your roof system which consists of 4 parts.
installing ice barrier on a roof A - ICE BARRIER
Ice barrier is installed at the eves and in valleys of heated spaces. This is a self-sticking membrane, designed to resist melt water from entering the house if it backs up under the shingles when ice dams are occurring.
installing felt paper on a roof B - FELT PAPER
Felt paper, installed over the remaining exposed decking was originally installed to protect the shingles from the sap in new roofing boards. Today its main function is to backup the shingles in situations of extreme windblown rain.
shingle installation C - SHINGLES
At last! It's starting to look like a roof again. Anyone can claim to be a roofer and slap on shingles, but few roofers have the hands on experience, installing hundreds of successful projects year in year out, with our ongoing training, support and inspections.
installing roof trim and detail work D - DETAILS
Details - vents, skylights, chimney flashings, pipe flashings, "the devil is in the details" must have been coined with roofing in mind. When inexperienced roofers have problems it is usually here. For us there is no such thing as 99%, we feel 1 drip is 100% failure. Our crews take pride in building a roof system that not only looks great but will provide years of worry free service.
finished roofing job 7. COMPLETED JOB
Once everything has been completed, we will sweep and haul away all of the debris around the house. All of our roofing trucks are equipped with magnets that will pick up stray nails around you property. If you are having (gutters, siding, or windows) installed, an additional crew will arrive within 1 week after the roof has been done. If there was a dumpster used at your property it will be removed after the job has been completed.